Frequently asked questions about finishing and building

Short answers to what homeowners ask most before finishing or building. Can’t find your question? Ask us directly.

General

Who is behind Z4ENG?

Z4ENG is led by Eng. Ali Noureldin, civil engineer and founder of Z4, and is part of the Z4 family of sites. You reach us directly on WhatsApp or by e-mail. Read more in About the engineer.

Where do you work?

We work in Egypt. Send the property’s location on WhatsApp and we will confirm whether a visit is possible before setting any date.

Do you work outside Egypt?

For projects outside Egypt we offer remote engineering services only, such as quantity take-off, BOQs, cost estimates and document checks, without stamping drawings or submitting them to authorities abroad. Details in Remote engineering services.

How do I start?

Send your request through the quote form, with photos of the unit if you have them, or message us on WhatsApp. We read the details and contact you to agree the next step.

Quotes and site visits

What does a quote include?

Our quote is a written BOQ: the items, quantities, each item’s specification, what the quote leaves out, the schedule and the payment stages. That way you can compare quotes item by item. See the finishing BOQ template.

Why don’t you publish a fixed price per m²?

Because the cost per m² changes with the finishing level, the unit’s state, the number of bathrooms and the items you want. A single figure misleads more than it helps, so we write an itemised quote after measuring. Read how to work out finishing costs.

Is there a fee for the site visit?

We explain the details of the visit on WhatsApp before it takes place, including any fee.

What should I prepare for the visit?

Drawings if you have them, the unit contract or its specification annex, a list of what you want, and permission to enter the building or compound. The full list is on the site-visit request page.

Do you build without a permit or on agricultural land?

No. Construction and supervision start only once the building permit is issued, and only on land that may legally be built on; we do not take part in building on agricultural land or without a permit.

Finishing

How do the finishing levels differ?

The levels differ in the visible materials and the level of detail: floors, paint, ceilings, sanitary ware, doors and windows. We write the actual specification of each item into your BOQ. Compare them on Finishing levels.

How long does a 100 m² apartment take?

It depends on the finishing level, the unit’s state and how quickly materials are chosen and approved. We do not give a single figure in advance; the schedule is part of the BOQ after the site visit. The order of the work is in apartment finishing stages.

Can I live there during a renovation?

It depends on the scope. For partial work it may be possible with careful phasing; for a full renovation it is usually better to move out for a while because of water and power cuts and dust. Details in Renovating older apartments.

Who does the work and who buys the materials?

We plan the work and follow its execution as engineers, from the first visit to handover. How the execution work is contracted, who buys the materials and how the trades are paid are all written clearly into the agreement before anything starts. Details in How we work.

Can I buy the materials myself?

We agree that in the quote and the written agreement.

Can I change things during the work?

Yes. The effect of the change on cost and schedule is agreed before it is carried out.

Which works need a permit?

Structural work, extra floors, additions, facade changes, restoration and strengthening need a permit under Article 39 of Building Law 119 of 2008. Interior finishing that does not touch the structure or the facade does not usually need one, but check with your local authority.

Do you offer 3D interior design?

We work out with you what is needed before the BOQ, and agree in writing who prepares the design if you need one.

Costs and payments

How do payments work?

The payments and their dates are written into the agreement before work starts. See the terms.

What is usually excluded?

Furniture, appliances, air-conditioning units, authority and utility fees and meters, and structural work, unless they are listed in the BOQ.

Egyptians abroad

How do I follow the work from abroad?

Before work starts we agree with you in writing how and when you follow it, and what you receive at each stage. Details on Egyptians abroad.

How do I pay from abroad?

We agree the payment method and currency in writing before work starts.

Who opens the unit for the visit?

A relative or friend you trust, the developer’s representative, or you during a visit to Egypt. We set the time with whoever will be there.

Do I need a power of attorney?

The engineering follow-up does not. Some official steps, such as permits, utility contracts or taking over the unit from a developer, may need you there or a formal power of attorney for someone acting for you.

Can you help with a Beit El Watan plot?

Yes, on the engineering side: planning, quantities, cost estimates and supervision. Permit conditions and deadlines are set by the city’s conditions booklet and its authority, and we check with you what your case needs.

Tools and calculators

Are the calculator results exact?

They are planning estimates based on visible assumptions you can change. Final quantities are set after a site visit or from the drawings. Try the engineering tools.

Why don’t the calculators show prices?

Because material prices change constantly and differ from place to place. The calculators give you quantities, and we price the items in a written quote after the site visit.

Can I work out my slab steel with the calculator?

The rebar weight calculator works out the weight from a bar list whose diameters, lengths and numbers you know. Deciding the slab’s reinforcement itself needs a structural design by an engineer.

Remote engineering services

What can you do remotely?

Quantity take-off from drawings, BOQ preparation, cost estimates with dated rates, drawing checks for quantities and buildability, payment-claim and schedule checks, value-engineering options and tender BOQs. Details in Remote engineering services.

Do you stamp drawings outside Egypt?

No. Our remote work is advisory only. Submissions to authorities outside Egypt need an engineer registered with the local authority.

What do I receive?

Depending on the job: Excel and PDF files for quantities, BOQs and estimates, and a check report as a PDF. Formats are agreed for each job.

How are fees set?

We reply with questions or a proposal for your scope.

Which time zone do you work in?

Cairo time. Calls are by appointment, at a time that suits both of us.

After handover

What happens after handover?

The handover snag list is closed item by item, then the agreed project documents are handed to you.

What if a defect appears after handover?

It is dealt with under the written agreement, and any liability that the law does not allow to be excluded remains. See the terms.