How we work: from your first message to handing over the keys
Eight clear steps, and written evidence that each one was done. That way you know where the work stands and what is waiting for your decision.
The steps, in order
You can start with the quote form, a site-visit request or a WhatsApp message.
- First contact
You send the type of work, location, size and photos on WhatsApp or through the form, so we understand the job before any appointment. - Site visit and survey
A visit request is confirmed with you on WhatsApp. On site we take measurements and photos and record the unit’s condition and what you want. - BOQ and specifications
We write down the items, quantities and specification of each item, what the quote leaves out, and a proposed schedule. - Choosing materials
You choose materials and colours, and the agreed specifications are written into the BOQ. - Written agreement
Work starts only under a written agreement that sets the scope, schedule, fees, payments and how changes are handled. - Stage-by-stage work
Each stage is checked before it is covered, and the evidence is recorded as photos, test results or measurements. - Handover and snag list
A final inspection and a written snag list, fixed item by item, then the project documents are handed to you. - After handover
Any defect that appears after handover is dealt with under the written agreement.
Main hold points
| Stage | What we check | Evidence |
|---|---|---|
| Electrical rough-in | Conduit routes and box positions against the layout drawing, circuit continuity | Photos of the routes before plaster, test result |
| Plumbing and drainage | Pressure test of supply pipes, drain falls, outlet positions | Test result and photos |
| Waterproofing | Flood test before tiling, watching for any leak | Photos at the start and end of the test |
| Plaster | Level, plumb, corners and thickness | Straightedge and spirit-level measurements |
| Rebar before casting (building work) | Diameters, numbers, spacing, concrete cover and laps | Photos and a sign-off record before the pour |
| Floors | Level, hollow tiles, joints and falls in wet areas | Tapping the tiles and measuring the level |
| Paint | Surface preparation, number of coats, even colour | Visual check under suitable light |
| Fittings | Appliances, switches, doors and windows working, no leaks | A test run and a snag list |
A hold point means the next stage does not start until the work it will cover has been checked. Which ones apply to your job is set in the BOQ.
How the execution work is contracted
We plan the work and follow its execution as engineers, from the first visit to handover. How the execution work is contracted, who buys the materials and how the trades are paid are all written clearly into the agreement before anything starts.
Questions about how we work
What if I change my mind during the work?
You can. The effect of a change on cost and schedule is agreed before it is carried out, so you decide knowing what it means.
Who buys the materials?
That is set in the written agreement before work starts. See “How the execution work is contracted” on this page.
How long does it take?
It depends on the finishing level, the unit’s state and how quickly materials are chosen and approved. The schedule is part of the BOQ, and we write it with you before work starts.
Read next
Apartment finishing stages, in order
What happens at each stage and what to check before moving on.
Finishing contract: clauses to check
What a contract should contain before you sign.
Terms of use and service
What a visit or quote request means and how work starts.
More answers about costs, visits and handover are in the frequently asked questions.
Start with a site visit
Pick a day and, if you can, a second option, and we will confirm the time with you on WhatsApp.