How we work: from your first message to handing over the keys

Eight clear steps, and written evidence that each one was done. That way you know where the work stands and what is waiting for your decision.

The steps, in order

You can start with the quote form, a site-visit request or a WhatsApp message.

  1. First contact
    You send the type of work, location, size and photos on WhatsApp or through the form, so we understand the job before any appointment.
  2. Site visit and survey
    A visit request is confirmed with you on WhatsApp. On site we take measurements and photos and record the unit’s condition and what you want.
  3. BOQ and specifications
    We write down the items, quantities and specification of each item, what the quote leaves out, and a proposed schedule.
  4. Choosing materials
    You choose materials and colours, and the agreed specifications are written into the BOQ.
  5. Written agreement
    Work starts only under a written agreement that sets the scope, schedule, fees, payments and how changes are handled.
  6. Stage-by-stage work
    Each stage is checked before it is covered, and the evidence is recorded as photos, test results or measurements.
  7. Handover and snag list
    A final inspection and a written snag list, fixed item by item, then the project documents are handed to you.
  8. After handover
    Any defect that appears after handover is dealt with under the written agreement.

Main hold points

StageWhat we checkEvidence
Electrical rough-inConduit routes and box positions against the layout drawing, circuit continuityPhotos of the routes before plaster, test result
Plumbing and drainagePressure test of supply pipes, drain falls, outlet positionsTest result and photos
WaterproofingFlood test before tiling, watching for any leakPhotos at the start and end of the test
PlasterLevel, plumb, corners and thicknessStraightedge and spirit-level measurements
Rebar before casting (building work)Diameters, numbers, spacing, concrete cover and lapsPhotos and a sign-off record before the pour
FloorsLevel, hollow tiles, joints and falls in wet areasTapping the tiles and measuring the level
PaintSurface preparation, number of coats, even colourVisual check under suitable light
FittingsAppliances, switches, doors and windows working, no leaksA test run and a snag list

A hold point means the next stage does not start until the work it will cover has been checked. Which ones apply to your job is set in the BOQ.

How the execution work is contracted

We plan the work and follow its execution as engineers, from the first visit to handover. How the execution work is contracted, who buys the materials and how the trades are paid are all written clearly into the agreement before anything starts.

Questions about how we work

What if I change my mind during the work?

You can. The effect of a change on cost and schedule is agreed before it is carried out, so you decide knowing what it means.

Who buys the materials?

That is set in the written agreement before work starts. See “How the execution work is contracted” on this page.

How long does it take?

It depends on the finishing level, the unit’s state and how quickly materials are chosen and approved. The schedule is part of the BOQ, and we write it with you before work starts.

More answers about costs, visits and handover are in the frequently asked questions.