Who it is for
For owners who have taken over a bare-brick or semi-finished apartment and want it ready to live in, or who own an older flat that needs re-finishing. We start from what you want and your budget, write the items at the right level, and follow the work stage by stage until you take over a home that is ready to live in.
What the service covers
- Electrical rough-in, with points for air conditioning, internet and TV.
- Plumbing and drainage for bathrooms and the kitchen.
- Bathroom and kitchen waterproofing, flood-tested before tiling.
- Plastering, set out with level dots and screeds.
- Gypsum board ceilings and lighting, depending on the level.
- Floors and wall tiles.
- Putty, sealer and paint.
- Doors, door frames and joinery.
- Aluminium windows.
- Fitting sanitary ware, the kitchen, switches and sockets.
- Final cleaning before handover.
How it runs
- Site visit and survey
Measurements, photos and a record of the unit’s condition and what you want. - BOQ and level
Items, quantities and each item’s specification at the level you choose, plus the schedule. - Choosing materials
You choose materials and colours, and the agreed specifications go into the BOQ. - Stage-by-stage work
Services first, then waterproofing and plaster, then ceilings and floors, then paint and fittings, with a check before each stage is covered. - Handover
A final inspection and a snag list, fixed item by item.
Checks before work is covered
| Stage | What we check | Evidence |
|---|---|---|
| Electrical rough-in | Conduit routes, box positions and circuit continuity | Photos of the routes before plaster, test result |
| Plumbing | Supply pipe pressure test and drain falls | Test result and photos |
| Waterproofing | Flood test before tiling | Photos at the start and end of the test |
| Plaster | Level, plumb and corners | Straightedge and spirit-level measurements |
| Tiles | Level, hollow tiles, joints and falls | Tapping the tiles and measuring the level |
| Paint | Surface preparation, number of coats, even colour | Visual check under suitable light |
What you receive
An itemised BOQ
Items, quantities, each item’s specification and what the quote leaves out.
A schedule
The stages of the work in order, with expected durations.
Check results and photos
Written evidence for each stage before it is covered.
A handover snag list
Fixed item by item before final handover.
What this service does not cover. Furniture, appliances and air-conditioning units are not included unless they are listed in the BOQ. Any change to load-bearing walls or structural elements needs a design and a permit, so in that case start with an engineering consultation. Finishing a shop or an office may need extra approvals depending on the activity, such as Civil Protection approval.
Gas connections and changes are made only by the gas company, and meters only by the utility companies.
How the execution work is contracted
We plan the work and follow its execution as engineers, from the first visit to handover. How the execution work is contracted, who buys the materials and how the trades are paid are all written clearly into the agreement before anything starts.
Questions about this service
Do you start from bare brick?
Yes. We start from bare brick, from semi-finished, or from an older apartment that needs re-finishing. The items differ with the state, which is why we start with a site visit.
Do I choose the materials myself?
Yes. We write a clear specification for each item, you choose a material that meets it, and the written agreement sets how your choices are approved.
How long does finishing an apartment take?
It depends on the size, the level, the unit’s state and how quickly materials are chosen. We write the schedule into the BOQ after the site visit.
Read next
Finishing levels
What each level includes, item by item.
What it costs to finish a 100 m² apartment
A line-by-line method.
Apartment finishing stages, in order
And what to check before each one.
Tile calculator
Tiles, boxes and adhesive.
The whole process
From your first message to handover.