Who it is for
For owners of an older flat with worn-out services, damp, surface cracks or finishes that no longer suit. Renovation starts with a condition check, so the budget is not spent on new finishes over an old problem.
What the service covers
- Checking the electrics, plumbing, walls and floors before any decision.
- Deciding what stays, what goes and what is renewed.
- Demolition and debris removal.
- Renewing electrical and plumbing services where needed.
- Treating damp and surface cracks before finishing.
- Renewing bathrooms and the kitchen.
- Floors, paint and doors.
- Phasing the work if you will live there during it.
How it runs
- Condition check
We inspect the services and the causes of any damp or cracks. - What stays and what goes
We write down with you what is renewed and what can be kept. - BOQ and schedule
Items, quantities and specifications, and a schedule that fits around you if you stay. - Stage-by-stage work
Demolition, then services, then finishes, with a check before each stage is covered. - Handover
A final inspection and a snag list.
Checks before work is covered
| Stage | What we check | Evidence |
|---|---|---|
| After demolition | The state of walls, ceilings and floors under the old finishes | Photos and notes |
| New services | Routes, pressure test and circuit checks | Photos and test results |
| Damp | The cause treated before anything is finished over it | Photos before and after treatment |
| Finishes | Level, hollow tiles and number of paint coats | Measurement and visual check |
What you receive
A condition report
What we found and what we advise before starting.
The BOQ
What is renewed and what stays, item by item.
The schedule
Planned around you if you live there during the work.
A handover snag list
Fixed item by item.
What this service does not cover. Removing or cutting load-bearing elements, such as columns, beams and load-bearing walls, is structural work that needs a design and a permit. Building or owners’ association rules and permitted working hours must be followed.
Gas connections and changes are made only by the gas company, and meters only by the utility companies.
How the execution work is contracted
We plan the work and follow its execution as engineers, from the first visit to handover. How the execution work is contracted, who buys the materials and how the trades are paid are all written clearly into the agreement before anything starts.
Questions about this service
Can I live there during the renovation?
For partial work it may be possible with careful phasing; for a full renovation it is usually better to move out for a while because of water and power cuts and dust.
Do I need to replace all the services?
Not always. We decide after checking their condition and age, and the reason goes into the BOQ.
What about damp in the walls?
We find the source first, because paint over damp whose cause was not treated comes back and fails.