Skip to content
Talk to us directly on WhatsApp
Request a quote العربية
Our Sites (opens in a new tab)

For Egyptians abroad: get your home in Egypt finished, with an engineer on your side

You don’t need to be in Egypt to follow your unit: a visit, a written BOQ before work starts, then follow-up in the way we agree with you.

What everyone abroad asks

How do I know what was done?

Before work starts, we agree with you in writing how and when you follow the work, and what you receive at each stage.

Will prices change after we start?

Work starts with a written, itemised BOQ, and the effect of any change on cost and schedule is agreed before it is carried out.

Who takes over the unit for me?

We can inspect the unit before you take it over and write a photo snag report for you to hand to the seller or developer.

How are decisions made while I am away?

We set out the options in writing on WhatsApp or by e-mail, and agree with you how your decisions are confirmed.

How we work with you remotely

  1. Send the unit’s details
    Location, size and state, with photos and the contract or specification annex if you have them.
  2. Site visit
    We visit at a time agreed with whoever opens the unit, and agree with you how you will follow the work.
  3. BOQ and schedule, approved remotely
    Items, specifications and schedule in writing, approved from wherever you are.
  4. Stage-by-stage work, checked
    Each stage is checked before it is covered, and the evidence is recorded as photos or test results.
  5. Handover and report
    A final inspection and a snag list, then the documents are handed over.

What to have ready before you message us

  • Where the unit is, its size and its current state.
  • The unit contract or the developer’s specification annex.
  • Recent photos of the unit, or who could take them.
  • Who holds the keys and can open the unit.
  • When you will be in Egypt, if you plan a visit.

Ways to follow the work

Follow-up agreed in writing

Before work starts, we agree with you in writing how and when you follow the work.

Services that fit

Official steps. Some steps, such as permits, utility contracts and taking over a unit from a developer, may need you to be there or to give someone a formal power of attorney. We tell you what your case needs.

Common questions from abroad

How do I follow the work from abroad?

Before work starts we agree with you in writing how and when you follow it, and what you receive at each stage. Details on Egyptians abroad.

How do I pay from abroad?

We agree the payment method and currency in writing before work starts.

Who opens the unit for the visit?

A relative or friend you trust, the developer’s representative, or you during a visit to Egypt. We set the time with whoever will be there.

Send us your unit’s details

We message you on WhatsApp at a time that suits your time zone. Prefer e-mail? Write to [email protected].

You
What do you need? (required)
The property
m²

An estimate is fine, for example 120.

Current state (required)
Who can open the unit for a visit? (optional)
Your details

The country code follows your country of residence. Country not listed? Type your number with + and the country code.

A good time to reach you (your time) (optional)
How should we contact you? (required)

WhatsApp (opens WhatsApp)