Skip to content
Talk to us directly on WhatsApp
Request a quote العربية
Our Sites (opens in a new tab)

Inspections

Apartment handover (snagging) inspection

An engineer inspects your apartment before you take it over from the developer or seller, semi-finished or finished, and gives you a photo snag report before you sign.

No obligation · we reply on WhatsApp

Who it is for

For anyone about to take over a unit from a developer or seller, semi-finished or finished, who wants to know what needs fixing before signing. The report gives you a clear list to put to the seller, and saves you from finding defects when it is too late.

What the service covers

  • Checking the unit against the specification in the contract or its annex.
  • Walls and ceilings: cracks, alignment and signs of damp.
  • Floors: level, hollow tiles and joints.
  • Doors and windows: fitting, sealing and operation.
  • Electrics: points against the plan, the board and earthing.
  • Plumbing: leaks, falls and water pressure.
  • Signs of waterproofing problems in bathrooms and the kitchen.
  • Facade and roof: signs of water leaks.

How it runs

  1. Send the contract and specification annex
    We read what the seller is bound to before the visit.
  2. Set the date
    We agree the inspection day with whoever opens the unit.
  3. On-site inspection
    A visual check with measurements and simple tests, with photos.
  4. Snag report
    An organised photo report for you to give to the seller or developer.
  5. Re-check if agreed
    After repairs, we check that the items were closed, if we agree to do so.

What we check

PartWhat we checkHow it is recorded
Walls and ceilingsCracks, alignment and dampPhotos and straightedge measurements
FloorsLevel, hollow tiles and jointsTapping the tiles and measuring the level
ElectricsPoints against the plan, board operationA test run and photos
PlumbingLeaks, falls and water pressureRunning the taps and watching the drains
Doors and windowsSealing and smooth opening and closingA test run and photos

What you receive

A photo report

Each item with its location and a photo.

A snag list for the seller

Organised for you to hand to the seller or developer.

Advice before you sign

What should be fixed before you sign for the unit.

What this service does not cover. The inspection is visual, with simple measurements and tests, so hidden defects inside finished elements may not show. The report helps you at handover; it does not replace your contract or a lawyer on your legal rights.

Fees are agreed in writing before work starts, according to the scope.

Questions about this service

Do you inspect semi-finished and finished apartments?

Yes. For semi-finished units we focus on plaster, services, openings and ceilings; for finished units we add floors, paint and fittings.

When should I ask for the inspection?

Before you sign the handover record, and once you have the contract and the specification annex.

What if the seller refuses to fix the items?

Go back to the contract terms and keep the report and photos. For legal disputes, consult a lawyer.

Ready to start?

Send your unit’s details and photos in two minutes, or message us on WhatsApp.

WhatsApp (opens WhatsApp)