Electrical and plumbing rough-in

Electrical rough-in for rooms, kitchen and air conditioning, and plumbing for bathrooms and the kitchen, on a clear layout, with pressure tests, circuit checks and photos before plaster.

No obligation · we reply on WhatsApp

Who it is for

Services are the part you cannot see once finishing is done, and a mistake there means breaking things open later. So we start with a layout you approve, then install and test before plastering, and photograph the routes. The service suits a new bare-brick flat or renewing the services of an older one.

What the service covers

  • A layout drawing of the points in every room before work starts.
  • Electrical conduits, boxes and cable routes.
  • Separate circuits for air conditioning, the kitchen and water heaters, by load.
  • The earthing route and the distribution board.
  • Internet, TV and intercom rough-in where needed.
  • Hot and cold water supply pipes.
  • Drainage with correct falls for bathrooms, kitchen and washing machine.
  • Pressure tests and circuit checks before anything is covered.
  • Photos of the routes before plaster, so you know later where the pipes run.

How it runs

  1. Layout drawing
    We agree with you where the points and appliances go in each room.
  2. Approving the points
    You check the drawing and approve it before any chasing or installation.
  3. Installation
    Conduits and boxes, then water supply and drainage, to the drawing.
  4. Tests and checks
    Pressure test of supply pipes, drain falls and circuit continuity.
  5. Photos, then plaster
    The routes are photographed before they are covered, then plastering starts.

Checks before work is covered

StageWhat we checkEvidence
Conduits and boxesRoutes and box positions against the drawingPhotos before plaster
CircuitsContinuity, and separate circuits for heavy loadsTest result
EarthingAn earth route that reaches the boardPhoto and test result
Supply pipesPressure held for long enough without droppingPhotos of the gauge reading
DrainageFalls, flow direction and floor-drain positionsMeasured fall and photos

What you receive

A layout drawing

Where the points and appliances go in each room.

Test results

Pipe pressure and circuit continuity.

Photos of the routes

So you know where pipes run inside walls and floors.

What this service does not cover. Meters are connected by the electricity and water companies. The electrician sizes cables and breakers from the load calculation and the Egyptian code.

Gas connections and changes are made only by the gas company, and meters only by the utility companies.

How the execution work is contracted

We plan the work and follow its execution as engineers, from the first visit to handover. How the execution work is contracted, who buys the materials and how the trades are paid are all written clearly into the agreement before anything starts.

Questions about this service

Why a layout drawing before work starts?

Because moving a point after plastering means breaking and redoing work. The drawing makes you decide early where beds, the TV, the kitchen and air conditioning go.

What are the route photos for?

They show where pipes run inside walls and floors, so you do not drill into them later when hanging something or making a change.

Should I replace the wiring and pipes in an older flat?

Often yes, if they are very old or damaged, but we decide after the site visit and a check of their condition, and the reason goes into the BOQ.