Who it is for
Services are the part you cannot see once finishing is done, and a mistake there means breaking things open later. So we start with a layout you approve, then install and test before plastering, and photograph the routes. The service suits a new bare-brick flat or renewing the services of an older one.
What the service covers
- A layout drawing of the points in every room before work starts.
- Electrical conduits, boxes and cable routes.
- Separate circuits for air conditioning, the kitchen and water heaters, by load.
- The earthing route and the distribution board.
- Internet, TV and intercom rough-in where needed.
- Hot and cold water supply pipes.
- Drainage with correct falls for bathrooms, kitchen and washing machine.
- Pressure tests and circuit checks before anything is covered.
- Photos of the routes before plaster, so you know later where the pipes run.
How it runs
- Layout drawing
We agree with you where the points and appliances go in each room. - Approving the points
You check the drawing and approve it before any chasing or installation. - Installation
Conduits and boxes, then water supply and drainage, to the drawing. - Tests and checks
Pressure test of supply pipes, drain falls and circuit continuity. - Photos, then plaster
The routes are photographed before they are covered, then plastering starts.
Checks before work is covered
| Stage | What we check | Evidence |
|---|---|---|
| Conduits and boxes | Routes and box positions against the drawing | Photos before plaster |
| Circuits | Continuity, and separate circuits for heavy loads | Test result |
| Earthing | An earth route that reaches the board | Photo and test result |
| Supply pipes | Pressure held for long enough without dropping | Photos of the gauge reading |
| Drainage | Falls, flow direction and floor-drain positions | Measured fall and photos |
What you receive
A layout drawing
Where the points and appliances go in each room.
Test results
Pipe pressure and circuit continuity.
Photos of the routes
So you know where pipes run inside walls and floors.
What this service does not cover. Meters are connected by the electricity and water companies. The electrician sizes cables and breakers from the load calculation and the Egyptian code.
Gas connections and changes are made only by the gas company, and meters only by the utility companies.
How the execution work is contracted
We plan the work and follow its execution as engineers, from the first visit to handover. How the execution work is contracted, who buys the materials and how the trades are paid are all written clearly into the agreement before anything starts.
Questions about this service
Why a layout drawing before work starts?
Because moving a point after plastering means breaking and redoing work. The drawing makes you decide early where beds, the TV, the kitchen and air conditioning go.
What are the route photos for?
They show where pipes run inside walls and floors, so you do not drill into them later when hanging something or making a change.
Should I replace the wiring and pipes in an older flat?
Often yes, if they are very old or damaged, but we decide after the site visit and a check of their condition, and the reason goes into the BOQ.
Read next
Taking over a semi-finished apartment
And checking the services before you sign.