Remote engineering support: quantity take-off, BOQs, cost estimates and document checks
For owners, developers and contractors in Egypt and abroad who need a civil engineer’s quantities, estimates and a second pair of eyes, delivered remotely in English or Arabic.
Who uses this
Owners who want to understand a contractor’s figures before they commit, small developers pricing a building, contractors preparing a tender who need quantities checked, and Egyptians abroad planning work in Egypt. The work is advisory: you receive quantities, estimates and written findings, not stamped drawings.
What can be done remotely
Quantity take-off from drawings
Quantities measured from your PDF drawings, item by item, with the measurement assumptions written down.
BOQ preparation
Bills of quantities for finishing and civil works, with units, quantities and short specification notes.
Cost estimates with dated rates
An estimate built on the BOQ, with the date and basis of every rate stated.
Drawing checks for quantities and buildability
We look for missing items, clashes and details that are hard to build, before pricing or work starts.
Payment-claim (IPC) checks
A contractor’s interim payment claim compared with the BOQ and the work reported.
Schedule checks
Whether a programme’s stages, order and durations make sense for the scope.
Value-engineering options
Alternatives that lower cost without lowering what matters, each with its trade-off explained.
Tender BOQs and specification notes
A clean BOQ and notes, so several contractors price exactly the same scope.
How it works
- Send the drawings and the scope
PDF drawings, any specifications and a short note on what you need. - We agree the scope and deliverables
We confirm with you what you will receive, and when, before we start. - The work, with questions
We ask about anything unclear rather than guess. - Delivery and a walk-through call
We send the files and go through them with you on a call.
Deliverables
| Item | Format | Typical content |
|---|---|---|
| Quantity take-off | Excel and PDF, agreed per job | Item list, units, quantities and measurement notes |
| BOQ | Excel and PDF, agreed per job | Items with specification notes, ready for pricing |
| Cost estimate | Excel with a PDF summary | Rates with their date and basis, totals by trade, exclusions |
| Check report | Findings by drawing or document, each with a suggested action | |
| Quote comparison sheet | Excel | Contractors’ prices side by side on the same BOQ lines |
Formats and the level of detail are confirmed in writing for each job.
Advisory only. We do not stamp drawings or submit them to authorities outside Egypt. Submissions abroad need an engineer registered with the local authority (in Saudi Arabia, for example, the Saudi Council of Engineers).
Related
BOQs and quantity take-off in Egypt
The same work for projects in Egypt, from drawings or a site survey.
Construction supervision
On-site engineering follow-up for projects in Egypt.
Finishing BOQ template
A printable template, trade by trade.
Common questions
What can you do remotely?
Quantity take-off from drawings, BOQ preparation, cost estimates with dated rates, drawing checks for quantities and buildability, payment-claim and schedule checks, value-engineering options and tender BOQs. Details in Remote engineering services.
Do you stamp drawings outside Egypt?
No. Our remote work is advisory only. Submissions to authorities outside Egypt need an engineer registered with the local authority.
What do I receive?
Depending on the job: Excel and PDF files for quantities, BOQs and estimates, and a check report as a PDF. Formats are agreed for each job.
Tell us about the project
We reply by e-mail with questions or a proposal for your scope. Prefer WhatsApp? Message us (opens WhatsApp).
