Who it is for
For owners of villas, detached houses and duplexes: larger areas, several floors, and facades and a roof that need special care. We organise the work floor by floor, and give the roof waterproofing and facades as much attention as the inside.
What the service covers
- Every apartment-finishing item, floor by floor.
- Facades and entrances.
- Roof waterproofing, and thermal insulation on request.
- Stairs and balustrades.
- Outside areas listed in the BOQ.
- The work phased by floor.
- Site organisation and material storage.
How it runs
- Site visit and survey
All floors, facades and the roof. - BOQ and phasing
Items and quantities, and the work split floor by floor. - Choosing materials
Inside and for the facades. - Stage-by-stage work
Services and waterproofing first, then finishes, with a check before each stage is covered. - Handover
A final inspection of each floor and a snag list.
Checks before work is covered
| Stage | What we check | Evidence |
|---|---|---|
| Roof waterproofing | Flood test and falls to the outlets | Photos at the start and end of the test |
| Facades | Alignment and joint treatment | Photos and visual check |
| Services | Routes, pressure tests and circuit checks on each floor | Photos and test results |
| Stairs | Dimensions, falls and balustrades | Measurements and photos |
What you receive
A BOQ for each floor
Items, quantities and specifications.
A phasing schedule
The work in order, floor by floor.
Check results and photos
Before each stage is covered.
A handover snag list
For each floor.
What this service does not cover. Landscaping and swimming pools are not included unless they are listed in the BOQ. Changing facades or adding floors needs a permit.
Gas connections and changes are made only by the gas company, and meters only by the utility companies.
How the execution work is contracted
We plan the work and follow its execution as engineers, from the first visit to handover. How the execution work is contracted, who buys the materials and how the trades are paid are all written clearly into the agreement before anything starts.
Questions about this service
Can one floor be finished and lived in before the others?
In most cases, yes, with phasing that keeps dust and water away from the floor in use, written into the schedule.
Does the service include the facades?
Yes, if they are in the BOQ, with the materials you choose.
How is the roof waterproofed?
We choose a suitable system, prepare the roof to falls, then flood-test it before finishing over it.