Waterproofing for bathrooms, kitchens and roofs

Waterproofing bathrooms, kitchens and roofs: choosing the system, preparing the surface, applying it and flood-testing before tiling, with photos of each step.

No obligation · we reply on WhatsApp

Who it is for

For anyone building or renovating a bathroom, kitchen or roof, or dealing with a leak that shows in a neighbour’s ceiling or on the top floor. Good waterproofing is invisible once finished, which is why we flood-test it before it is covered.

What the service covers

  • Choosing the system for the area: cementitious, membrane or liquid.
  • Preparing the surface: cleaning, levelling and treating corners.
  • Turning the waterproofing up the walls to a suitable height.
  • Detailing around pipes and drains.
  • A flood test before tiling.
  • Roof thermal insulation on request.
  • Photos of each step before it is covered.

How it runs

  1. Checking the area
    Why waterproofing is needed and the state of the surface.
  2. Choosing the system
    By location, use and the product data.
  3. Preparation and application
    The surface prepared, then waterproofed and turned up the walls.
  4. Flood test
    The area flooded with water and watched for leaks.
  5. Protection and covering
    A protective layer, then the finishes on top.

Checks before work is covered

StageWhat we checkEvidence
Surface preparationCleanliness, level and cornersPhotos
WaterproofingContinuity, upstands and pipe detailsPhotos before covering
Flood testNo leak for the whole testPhotos at the start and end of the test

What you receive

Photos of each step

Before it is covered.

The flood test result

Recorded with photos.

The product used

Its name and type, as in the supplier’s data sheet.

What this service does not cover. Product data and any manufacturer’s commitment come from the supplier, not from Z4ENG. If the problem is a pipe leak, the pipes are fixed before any waterproofing.

How the execution work is contracted

We plan the work and follow its execution as engineers, from the first visit to handover. How the execution work is contracted, who buys the materials and how the trades are paid are all written clearly into the agreement before anything starts.

Questions about this service

How long is the flood test?

It depends on the system and the location, and it is written into the BOQ. What matters is that nothing is tiled before the test ends with no leak.

Does a roof need thermal insulation?

Thermal insulation makes the top floor cooler in summer, and it is added if you want it and the budget allows.

Does waterproofing cure existing damp?

Not always. We find the source of the damp first: it may be a pipe leak or rising damp that needs a different treatment.