Last updated: 7 November 2026
These terms govern your use of z4eng.com and explain what any request you send through it means. By using the site you accept them.
Who we are
z4eng.com is run by Z4ENG, led by Eng. Ali Noureldin, civil engineer, as part of the Z4 family of sites. Contact: [email protected] or WhatsApp +20 155 020 6069.
The website and its content
The site offers general information about our services, guides, calculators and forms to request a quote or a site visit. Guides and calculators do not replace a site visit, a design by a qualified engineer, or legal advice on your case.
Calculators and estimates
Calculator and cost-estimator results are planning estimates based on visible assumptions. They are not a quote and not a commitment to quantities or prices. Final quantities and prices are set after a site visit, in a written BOQ.
Requests
Sending a quote or site-visit request does not create a contract. A visit time is confirmed with you on WhatsApp; until then it remains a request, not a booking.
How work starts
No work starts without a written agreement that sets the scope (the BOQ), the specifications, the schedule, the fees, the payment stages and how changes are handled.
Who carries out the work and who buys the materials
We plan the work and follow its execution as engineers, from the first visit to handover. How the execution work is contracted, who buys the materials and how the trades are paid are all written clearly into the agreement before anything starts.
Changes
Any change to what was agreed is written down, and its effect on cost and schedule is agreed, before it is carried out.
Your responsibilities
- Give access to the site at the agreed times.
- Provide the water and power needed for the work, unless agreed otherwise.
- Obtain building or compound approvals, and permits where they are required.
- Make decisions and approve materials on the agreed dates, because delays affect the schedule.
- Give accurate information about the property and its legal status.
Permits and safety
Work that needs a permit, such as building, adding floors, structural changes, facade changes, restoration and strengthening, is not carried out without one (Article 39 of Building Law No. 119 of 2008). We do not take part in building on agricultural land or without a permit. Gas connections and changes are made only by the gas company. We may refuse any instruction we consider unsafe.
Handover and defects
When the work is finished we inspect it with you and write a snag list, and the items are put right before final handover, as agreed.
In every case, any liability that the law sets and does not allow to be excluded remains, including the liability of engineers and contractors under Article 651 of the Egyptian Civil Code.
Photos of the work
We publish photos or details of your home only with your written consent, and you can withdraw consent at any time; we then remove the photos from the site.
Content and templates
You may use the guides, templates and checklists on this site for your own use, but not resell them or publish them under another name.
Limits of liability
We take reasonable care over the accuracy of what we publish, but it is general information that may not fit your case. Nothing in these terms limits a liability that the law does not allow to be limited.
Governing law
These terms are governed by Egyptian law.
Changes and contact
We may update these terms and change the “Last updated” date. For questions, contact us at [email protected] or on WhatsApp. See also the privacy policy.
